Industrial Rooftop Solar Enquiry

Industrial rooftop solar enquiry

Prepare Your Industrial Rooftop Solar Enquiry

Share the building, electricity and ownership details needed for an initial solar feasibility discussion. A qualified provider must assess the actual roof, connection and commercial proposal.

your@email.com" required>

What to Prepare for an Assessment

📈

Electricity and operating profile

Gather recent electricity bills, maximum demand and daytime consumption data where available. Record operating hours and planned equipment changes.

☀️

Roof condition and usable space

Provide roof plans, condition information, existing equipment and warranties. The technical assessment should cover structure, shading, access, fire provisions and electrical connection.

📝

Ownership, consent and lease terms

Identify the owner and electricity account holder. For a tenancy, clarify roof rights, remaining term, installation consent, maintenance and removal or transfer obligations.

📅

A comparable commercial proposal

Ask the provider to separate equipment, connection works, recurring charges, maintenance and end-of-term costs. Any savings or payback estimate should identify its assumptions and be tested against your actual consumption.

🔗

Current programme and incentive guidance

Use SEDA’s Solar ATAP guidance and the relevant MGTC green incentive guidance with your provider and advisers. Programme participation and tax eligibility are separate assessments.

Your enquiry details

We use the information you provide to respond to your property-related enquiry and discuss the next step. See our Privacy Policy. Avoid sending sensitive identity or financial documents in an initial enquiry.

How the Enquiry Works

1

Share the Brief

Tell us the site, your role, electricity profile and the question you want to assess.

2

Clarify the Details

Identify missing roof, account, ownership or tenancy information.

3

Agree the Assessment

Confirm the appropriate provider, scope, requirements and any quotation before work proceeds.

4

Review the Proposal

Consider technical findings, costs, responsibilities and current programme requirements together.

Questions Before You Submit

Can a factory tenant enquire about rooftop solar?

Yes. Include the remaining tenancy term and identify the owner and electricity account holder. Permission, roof rights and responsibilities must be agreed before proceeding.

Is this an engineering audit or a guarantee of savings?

No. This form starts an enquiry. A project-specific technical and commercial assessment is needed before a system size, savings estimate or implementation plan can be relied on.

Does Solar ATAP participation establish GITA eligibility?

No. Confirm the applicable solar programme and green incentive route separately with the relevant agency and advisers.

Read our industrial rooftop solar preparation guide or contact the property desk.