Choosing industrial premises and planning an investment application should be coordinated. The building must meet the operational brief, while the company’s proposed investment and activity require their own assessment.
Prepare the business project first
Document your products, processes, investment, employment, local supplier needs, export markets and implementation schedule. These details help advisers assess the applicable investment and approval routes.
Match the property to the activity
Verify the intended use, utilities, environmental needs, access and occupation documents for the actual premises. An address inside an industrial park is useful location information, but is not an assurance of incentive eligibility.
Check the New Incentive Framework with current guidance
Discuss the relevant MIDA framework, available application routes, qualifying criteria and timing directly with MIDA and your professional advisers. Compare tax options using your project’s expected investment and taxable income, and obtain advice before making an election or incurring expenditure.
Keep the timetable realistic
Allow for property due diligence, applications, landlord consent, utility works, fit-out, machinery installation and commissioning. Make contractual milestones clear where the project depends on an approval.
Explore built-to-suit premises or send your factory requirements for a property shortlist.
Translate the investment project into a property brief
MIDA describes the NIF as outcome-based, with attention to investment outcomes such as skilled employment, domestic supply chains and sustainability. For the premises search, translate your business plan into a process layout, utility schedule, workforce needs and commissioning milestones. Keep this operational evidence alongside the company’s investment application records.
A joined-up project checklist
- Products, processes and proposed manufacturing activity.
- Production and storage layout, warehouse and office areas, and expansion allowance.
- Equipment loads, electricity requirements, water, waste and other process services.
- Title and premises documentation, intended-use checks and permissions for works.
- Supplier quotations, capital expenditure schedule, jobs and implementation milestones.
- Responsible adviser, outstanding approvals and decisions needed before contractual commitments.
Use MIDA’s manufacturing forms and guidelines for the current application documents. Compare land for a proposed facility with existing factories before deciding whether a development programme or an adaptation of existing space better fits the operation.
Questions to clarify before your next step
Does locating inside an industrial park automatically qualify a project for NIF incentives?
No. Location and premises are only part of the project. The applicant, proposed activity, investment outcomes and applicable criteria require their own assessment through MIDA’s current process.
Should I choose a factory before speaking to investment advisers?
Develop the operational brief and seek application-sequence advice early. The property search, investment assessment and approvals can then be coordinated without assuming one decision resolves the others.
What if the preferred factory needs a power upgrade?
Obtain written information on the required upgrade, responsible party, cost and expected timing. Include those steps in the proposed lease or purchase programme and the commissioning plan.